You can choose among different options:
Basically the difference lays in two features:
No problem at all!
You just will be billed for the extra power consumption at the end of the month.
Normally for us it takes 4 week to deliver the rack.
We install 2 managed PDUs in each rack that are monitored through the PRTG system.
In order to have our SLA contract, please get in touch with us.
We invoice monthly in advance the 14th of each month.